SG2 Silt Guardian Silt Separator
£1,082.93 ex. VAT
£1,299.52 inc. VAT
Silt Separator
- Silt retention – Litres: 1800.
- Drainage SQM: 10000.
- Inlet/Invert 110/160
- Pipework: 625.
- Inlet/Invert 225/300/375/450: 650/685/720/760.
- Material: Polyethylene, HDPE.
Estimated Lead time: 2-7 Working Days
Description
The SG2 Silt Guardian Silt Separator is designed to efficiently capture and remove silt and sediment from stormwater runoff. This system is ideal for construction sites, industrial facilities, and municipal drainage systems where sediment control is critical to prevent pollution and maintain water quality.
Dimensions: H:2550 X D:1260mm
Weight: 110kg
Benefits:
- Sediment Pollution Prevention: Helps prevent sediment and silt pollution in water bodies, preserving water quality and protecting aquatic ecosystems.
- Regulatory Compliance: Assists construction sites, industrial facilities, and municipalities in meeting regulatory requirements for stormwater management and pollution prevention.
- Cost-Effective: Reduces the need for costly sediment cleanup and remediation efforts, saving time and resources.
- Environmental Protection: Contributes to environmental conservation efforts by preventing sediment runoff and promoting sustainable stormwater management practices.
Technical Specifications:
- Model: SG2 Silt Guardian Silt Separator
- Material: High-density polyethylene (HDPE) or reinforced fiberglass, depending on model and application
- Flow Rate: Designed to handle flow rates up to [specific flow rate, e.g., 150 liters per second]
- Inlet/Outlet Sizes: Compatible with standard pipe sizes (e.g., 300mm, 400mm)
Installation and Maintenance:
- Site Preparation: Ensure a stable and level installation site, with proper bedding material as needed.
- Plumbing Connections: Connect the SG2 to the existing drainage system using the appropriate inlet and outlet pipes, ensuring secure and sealed connections.
- Regular Inspection: Conduct routine inspections to check for sediment buildup and blockages, cleaning the separator as necessary to maintain efficiency.
- Service Access: Utilize the access points and inspection chambers for convenient maintenance and cleaning operations.
Applications:
- Construction Sites: Ideal for construction sites to control sediment runoff and comply with erosion and sediment control regulations.
- Industrial Facilities: Used in industrial facilities to prevent sediment pollution in stormwater runoff from parking lots, storage yards, and production areas.
- Municipal Drainage Systems: Installed in municipal drainage systems to protect stormwater infrastructure and water bodies from sediment contamination.
Key Features
- Efficient Sediment Removal: The SG2 utilizes advanced filtration technology to efficiently capture sediment and silt particles from stormwater runoff, preventing them from entering drainage systems and water bodies.
- Durable Construction: Constructed from high-quality materials, including corrosion-resistant components, the SG2 is built to withstand harsh environmental conditions and deliver long-lasting performance.
- Modular Design: The modular design of the SG2 allows for flexible configuration and scalability to accommodate various site requirements and flow rates.
- Easy Installation: The SG2 is designed for easy installation, with simple connections to existing drainage systems and minimal site preparation required.
- Low Maintenance: With its self-cleaning design and minimal moving parts, the SG1 requires minimal maintenance, reducing downtime and operational costs.
Related Documents
Returns
At Tanks Nationwide, we value your satisfaction with every purchase. If you find yourself needing to return an item, we offer a straightforward process within 14 calendar days, as outlined in our Terms & Conditions.
Please note that some items, such as custom-made products or items for sanitary purposes, may not be eligible for return. We recommend reviewing the product page for specific return information before making your purchase.
All returned items must be in unused condition and in their original packaging. Unfortunately, we cannot issue refunds for items that have been used or installed.
Returning large items, like tanks, can be complex and costly, so it’s important to double-check the dimensions and specifications before ordering.
To begin the return process, please fill out the form on our contact page. Once your request is approved, you’ll receive instructions on how and where to return your order, including any associated costs.
We’re committed to ensuring your satisfaction, and our customer service team is here to assist you every step of the way. If you have any questions or concerns, please don’t hesitate to reach out.
Delivery
Our shipping costs cover most of the UK - however, parts of England, Scottish Highlands and Islands including areas north of the Glasgow / Edinburgh border, Isle of Wight, Channel Islands, Isle of Man, Anglesey, Western Isles, Shetland Islands, Orkney Islands, Isles of Scilly, Northern Ireland and the Republic of Ireland may cost more.
Estimated Lead time: 2-7 Working Days. Our lead times should only be used as a guide and are subject to change.
Related Products
Reviews
There are no reviews yet.